Changxing Tuoke Machinery Co., Ltd. in Huzhou specializes in high-temperature molten metal and uses high energy-consuming facilities for industrial production, which consume a lot of power during the production process and incur high electricity costs before the installation of AIKO’s photovoltaic (PV) modules. The project has an installed area of 12,000 square meters and a total installed capacity of 1.98 MW, in the mode of self-generation for self-consumption, feeding surplus power into the local power grid.
Project results
Annual savings in standard coal
618.06 tons Annual savings in standard coal
Annual reduction in CO? emissions
1,174.93 tons Annual reduction in CO? emissions
Equivalent to annual tree planting
3,264 trees Equivalent to annual tree planting
Annual power generation
2,060,200 kWh Annual power generation
The project is expected to generate more than 2 million kWh of electricity per year; before and after the installation of AIKO’s PV modules, the annual power consumption of the company is about 1.5 million kWh and 880,000 kWh respectively; the surplus power can be fed into the local power grid to obtain economic benefits.
Lu Jun Client
Testimonial
Before installing the PV modules, we were a high energy-consuming company, and the high price of utility electricity increased our actual operation cost. Since installing the ABC modules, we have realized an annual power generation of about 2 million kWh, which exceeds our expectations. We are quite satisfied with this. We will continue to choose AIKO’s products in the future.
Lu Jun Responsible person of the park of Changxing Tuoke Machinery Co., Ltd. in Huzhou